Altus® is built on more than 150 years of New Zealand manufacturing, innovation and industry expertise. Its story brings together a rich heritage of pioneering businesses, trusted window and door brands, aluminium manufacturing, and generations of skilled people.

From the earliest foundations of Alex Harvey Industries in 1866, through the development of Rylock®, Fisher® Windows, Nulook®, Window Technologies Ltd, NALCO and Fletcher Aluminium, each chapter has helped shape the business Altus® is today.

The launch of the Altus® joint venture in 2016 brought these strengths together, creating an integrated New Zealand aluminium business with a proud history and a continued focus on innovation, performance and local manufacturing.

This timeline highlights the defining moments, partnerships and investments that have shaped the Altus® journey.

1860s
1950s
1960s
1970s
1980s
1990s
2000s
2010s
2020s

1860s

1866

Alexander Harvey begins manufacturing dairy cans in Durham Street, Auckland – the forerunner of Alex Harvey Industries (AHI).

1950s

1954

Ry-Lock Co Ltd is incorporated on 12 April.

1960s

1961

The Alcan plant is established at Wiri, Auckland, and its rolling mill begins production.

1964

The Alcan extrusion plant begins production.

1965

Fisher® Windows buys Rylock®.

1967

Nulook® Windows NZ Ltd is incorporated on 10 July.

1969

AHI buys Rylock® and Fisher® Windows. Manapouri Power Station opens.

1970s

1970

Ron Holden enters the industry, making Rylock® windows in Timaru using AHI kitsets. Comalco Extrusions Ltd is believed to have opened the Bowden Road site; the source labels this date a “best guess.”

1971

The Tiwai Point aluminium smelter opens, with Comalco holding a 50% ownership interest.

1972

AHI buys Lyte Aluminium.

1974

An anodising plant and second press are commissioned at Bowden Road, and the remelt plant becomes operational. Technical development and improvement programmes are established for staff.

1980s

1980

Bowden Road introduces computerised production planning and control systems, together with productivity reporting.

1982

AHI buys 50% of Oakley Architectural Windows.

1984

The Bowden Road plant is substantially upgraded with the latest technology and two-stage anodising and colouring. The upgrades are subsequently adopted by Comalco sites worldwide.

1985

Comalco Extrusions Ltd buys AHI.

1988

Alcan buys Nulook®.

1990s

1990

Comalco Extrusions Ltd merges with CHHA Franchising Ltd to form Comalco CHH Aluminium.

1995

Capral buys Alcan.

1996

Fletcher Challenge Building Products buys Comalco to form Fletcher Aluminium. This brings Vistalite® and Nebulite® together with Rylock® and Fisher® Windows. The Lyte brand is discontinued.

1997

Ron and Wendy Holden establish Window Technologies Ltd (WTL).

1998

Ron and Wendy Holden meet Bill and Jan Bradnam and agree to pursue a future together.

1999

New window-suite designs are progressed in partnership with Bill and Jan Bradnam, eventually leading to their shareholding in WTL. Capral closes its Wiri factory and acquires Fletcher Aluminium’s Hamilton site.

2000s

2001

Michael Petersen joins WTL and becomes a key contributor to product design and preparations for bringing products to market.

2002

The Holden/Bradnam partnership establishes NALCO as a joint venture with Capral Australia, taking over 50% of Capral New Zealand’s assets.

2003

Bradnam’s® Windows and Doors is established at Barmac Place in Auckland, together with Stellar® Doors. NALCO purchases Merit Aluminium in Rotorua to form Bradnam’s® Rotorua.

2004

NALCO’s Industrial division commissions the largest flat-bed router in New Zealand.

2005

Bradnam’s® Christchurch is established.

2006

WTL purchases Capral’s shareholding and becomes the 100% owner of NALCO.

2008

Bradnam’s® Wellington is established.

2010s

2012

NALCO moves from East Tamaki to its current Highbrook site.

2015

Nulook® celebrates its 50th anniversary. A new Turla press is ordered.

2016

NALCO and Fletcher Aluminium launch their joint venture, Altus®. The 8-inch Turla press becomes operational and pushes its first billet.

2019

Altus® names its two leading business units: Altus® Industrial Aluminium (AIA) and Altus® Window Systems (AWS).

2020s

2020

The Altus® Board decides to invest in a second new press for the Hamilton site and to close Bowden Road in 2023 because its lease is not renewable or viable. A vertical paint line is commissioned in Hamilton, and the Altus® corporate brand (AIAWS) is introduced.

2021–2022

Window and door product development, already underway for approximately three years, is severely affected by the new H1 thermal requirements. Altus® invests in three new thermal-processing machines, a new building on Hounsell Road in Hamilton, and further product design.

2023

A new 7-inch Omav press is commissioned in Hamilton. The Bowden Road operation closes in April.

2026

Significant investment sees ‘The Brushes’ that clean and buff mill finished aluminium installed on the Vertical Paint Line, helping to increase powder coat adherence and management of incoming metal quality.